中文无码日韩欧I亚洲综合网站I亚洲无限avIwww在线看I午夜精品一区二区国产I久久久999视频I美女被男人桶出白浆喷水I亚洲精品一线二线在线播放I久久久久久久久久久97I蜜臀aⅴ国产精品久久久国产老师I深爱婷婷I7777精品伊久久久大香线蕉软件的特点I欧美经典一区I男女免费avI久久9999久久免费精品国产I肥婆大荫蒂欧美另类I色老大影院I色老大网站I黄色片网站在线I亚洲成人久久精品I色一情I一本之道avI新超碰97I欧美一级黄I91亚洲精华国产精华精华液I国产电影精品一区I麻豆一区二区三区四区

Welcome [Wuxi Frame Machinery Manufacture Co.,Ltd] !

Installation and adjustment of the foundation of the pump base

1. Remove oil and dirt from the base and place the base on the foundation.
2. Use a spirit level to check the level of the base and allow the wedges to level.
3. Secure the base holes and anchor bolt holes.
4. After the cement is dry, check whether the foundation and anchor bolt holes are loose, tighten the anchor bolts when appropriate, and recheck whether the foundation is flat.
5. Clean the support plane of the base, the foot plane of the circulating water pump and the motor, and install the circulating water pump and the motor on the base.
6. There should be a certain gap between the couplings, and check whether the center of the pump shaft is consistent with the center of the motor shaft. It can be adjusted with a shim to make it concentric. Install a pressure gauge at the outlet flange of the water pump to observe and control the operation of the water pump. If the flow exceeds the rated flow and the current is too large, the opening of the outlet valve can be adjusted to control the flow and current.
2022/04/16 08:36:20 3921

主站蜘蛛池模板: 通化市| 定远县| 昂仁县| 芮城县| 海口市| 汶上县| 改则县| 英德市| 曲松县| 随州市| 茌平县| 莆田市| 明星| 怀化市| 莆田市| 佛坪县| 永嘉县| 金川县| 策勒县| 浪卡子县| 泸州市| 陕西省| 青铜峡市| 陵川县| 马公市| 察雅县| 寿阳县| 修文县| 宿迁市| 六盘水市| 宜兰市| 望奎县| 兴山县| 西安市| 射洪县| 石门县| 三江| 太原市| 华亭县| 拜泉县| 罗城|